ITCertKing is website that can take you access to the road of success. ITCertKing can provide the quickly passing HP certification HP5-K03D exam training materials for you, which enable you to grasp the knowledge of the certification exam within a short period of time, and pass HP certification HP5-K03D exam for only one-time.
In order to pass HP certification HP5-K03D exam disposably, you must have a good preparation and a complete knowledge structure. ITCertKing can provide you the resources to meet your need.
Exam Code: HP5-K03D
Exam Name: HP (Delta - Supporting and Servicing HP 3PAR StoreServ Solutions)
One year free update, No help, Full refund!
Total Q&A: 30 Questions and Answers
Last Update: 2013-10-15
ITCertKing's HP HP5-K03D exam training materials are the best training materials of all the Internet training resources. Our visibility is very high, which are results that obtained through many candidates who have used the ITCertKing's HP HP5-K03D exam training materials. If you also use ITCertKing's HP HP5-K03D exam training materials, we can give you 100% guarantee of success. If you do not pass the exam, we will refund the full purchase cost to you . For the vital interests of the majority of candidates, ITCertKing is absolutely trustworthy.
Our ITCertKing have a lot of IT professionals and the exam practice questions and answers we provide have been certified by many IT elites. Besides, the exam practice questions and answers have wide coverage of the content of the examination and the correct rate is up to 100%. Although there are many similar websites, perhaps they can provide you study guide and online services, our ITCertKing is leading these many websites. The reason of making the ITCertKing stand out in so many peers is that we have a lot of timely updated practice questions and answers which accurately and correctly hit the exam. So we can well improve the exam pass rate and make the people ready to participate in HP certification HP5-K03D exam safely use practice questions and answers provided by ITCertKing to pass the exam. ITCertKing 100% guarantee you to pass HP certification HP5-K03D exam.
HP5-K03D Free Demo Download: http://www.itcertking.com/HP5-K03D_exam.html
NO.1 What must be done prior to running HP 3PAR SmartStart?
A. The service laptop needs to be connected to the StoreServ system.
B. The Service Processor and StoreServ system must be connected to the same subnet
C. An installation service call must be placed with HP Central,
D. A zone must be created between the StoreServ system and the Service Processor.
Answer: B
HP HP5-K03D HP5-K03D test questions HP5-K03D certification HP5-K03D certification training
NO.2 A customer has an existing c70fJ0 enclosure, with 6 blades and FlexFabric modules. You have
been asked to install 5 additional blades for a virtualization project. The customer requires shared
storage for a Hyper-V cluster.
Their existing storage infrastructure is 1Gb iSCSI.
What would be the most cost-effective method for adding a new 3PAR storage?
A. Directly attach the FC Host ports of the c7000.
B. Install SAN Switch Modules in the c7000.
C. Install two Brocade 8 / 8 SAN Switches
D. Upgrade the network switches to 10GB
Answer: A
HP dumps HP5-K03D test HP5-K03D exam HP5-K03D practice test
NO.3 A customer has three HP 3PAR StoreServ 10000 systems in different sites on their
metropolitan campus The FC-based SANs within the different sites consist of B-series 8 Gbps
switches with an active port-based zoning. Between the sites, there is a 10 Gbps Ethernet
connection.
Which remote copy configuration should you recommend?
A. N-to-1 Configuration
B. Synchronous Long Distance Configuration
C. Unidirectional 1-to-1 Configuration
D. 1-to-N Configuration
NO.4 Your customer has an existing HP 3PAR F400 array with two controller nodes and eight DC3
disk enclosures Each DC3 disk enclosure is fully populated with 300GB 15k disk drives.
The customer has purchased a new HP 3PAR StoreServ 7400 two-node system with five additional
drive enclosures to be installed in a second data center. This system is fully populated with 450GB
10k drives. Data will be migrated from the F400 to the 7400 by using Remote Copy Fibre Channel
(RCFC). The 7400 will then become the primary system, but data will continue to be replicated
between the systems. Additionally, the customer has ordered extra 8GB/S FC adapters for the new
7400.
What is the maximum number of configurable host ports on the new HP StoreServ 7400 array in the
customer environment?
A. 4
B. 8
C. 10
D. 12
Answer: D
HP demo HP5-K03D HP5-K03D
5. Your customer has an existing HP 3PAR F400 array with two controller nodes and eight DC3
disk enclosures. Each DC3 disk enclosure is fully populated with 300GB 15k disk drives.
The customer has purchased a new HP 3PAR StoreServ 7400 two-node system with five additional
drive enclosures to be installed in a second data center. This system is fully populated with 450GB
10k drives Data will be migrated from the F400 to the 7400 by using Remote Copy Fibre Channel
(RCFC). The 7400 will then become the primary system, but data will continue to be replicated
between the systems. Additionally, the customer has ordered extra 8GB/s FC adapters for the new
7400.
During the installation you record these serial numbers for the new HP 3PAR StoreServ system:
HP serial number CZ32439658
3PAR serial number 1628580
Which SPID is assigned during the installation?
A. SP0001628580
B. SP32439658
C. 1628580
D. 00032439658
Answer: A
HP exam simulations HP5-K03D test answers HP5-K03D HP5-K03D original questions
Reference:http://bizsupport2.austin.hp.com/bc/docs/support/SupportManual/c03603825 /c036038
2 5.pdf(page 7, second bullet)
6. Which statements are true about the HP 3PAR StoreServ 7000? (Select two.)
A. Within a column, there can be empty slots between drives.
B. Columns of drives must be of the same drive type and rotational speed for HDDs.
C. Drives must be added in identical pairs.
D. The LFF enclosure cannot be mixed with the SFF enclosure on the same node pair,
E. All columns have to contain the same number of drives.
Answer: B,C
HP certification training HP5-K03D HP5-K03D exam HP5-K03D practice test
7. Your customer plans to build a two-tier architecture with one HP 3PAR StoreServ 7400. Layer 1
should be the SSD Tier, and Layer 2 should be the Fast Class Tier. After the SmartStart configuration
is complete, the customer connects to the system through the InformOS Management Console.
Which default CPGs are created during the process of initializing the storage system?
A. SSD RAID 1 and 5: Fast Class 1 and 6 default CPGs
B. SSD RAID 1 and 5: Fast Class 1 and 5 default CPGs
C. SSD RAID 1,5,and 6; Fast Class 1 and 6 default CPGs
D. SSD RAID 1 and 5 FastClass 1,5 and 6 default CPGs
Answer: A
HP HP5-K03D exam HP5-K03D
ITCertKing offer the latest 70-464 exam material and high-quality 1Z0-597 pdf questions & answers. Our 70-415 VCE testing engine and 700-101 study guide can help you pass the real exam. High-quality 74-344 dumps training materials can 100% guarantee you pass the exam faster and easier. Pass the exam to obtain certification is so simple.
Article Link: http://www.itcertking.com/HP5-K03D_exam.html